The primary infrastructure forms a double loop figure of eight with its centre in the CBD. The street profile has the capacity to accommodate a tram system in the future,this would have a catchment area covering the majority of the city. The double loop of primary infrastructure connects into the higher level road network – the motorway running North-South and the regional highway that runs along the coast. It also connects also into the secondary road network which serves the development plots.

walkable streets